TURBODEN | SELECTED GEOTHERMAL REFERENCES
Plant type | Two level cycle geothermal unit |
Location | Bavaria | Germany |
Customer | SWM | StadtWerke München (public utility) |
Heat source | Geothermal fluid at 140°C |
Cooling device | Air condensers |
Total electric power | 5+ MWel plus 4 MWth for district heating |
In operation since | Q1 2013 |
Location | Dürrnhaar (München) | Germany |
Customer | Hochtief Energy Management GmbH |
Heat source | Geothermal fluid at 138°C |
Total electric power | 5,600 kW |
Scope of supply | EPC contract for the complete ORC unit, including the Air Cooled Condenser and the geothermal balance of plant |
In operation since | Q4 2012 |
Location | Kirchstokach (Munchen) | Germany |
Customer | Hochtief Energy Management GmbH |
Heat source | Geothermal fluid at 138°C |
Total electric power | 5,600 kW |
Scope of supply | EPC contract for the complete ORC unit, including the Air Cooled Condenser and the geothermal balance of plant |
In operation since | Q1 2013 |
Location | Traunreut (Bavaria) | Germany |
Customer | Geothermische Kraftwerksgesellschaft Traunreut |
Heat source | Geothermal fluid at 118°C |
Total electric power | 4,100 kW |
Total thermal power | 12,000 kW (to the District Heating) |
Scope of supply | Supply of the complete ORC unit, including the Air Cooled Condenser and control system |
In operation since | Under construction |
Plant type | Heat recovery from pressurized water boiler in waste incinerator |
Location | Roeselare | Belgium |
Customer | MIROM |
Heat source | Hot water @ 180 °C (back @140 °C) |
Cooling source | Water/air |
Total electric power | 3 MWel |
Net electric efficiency | 16,5% |
Availability | > 98% |
In operation since | Q2 2008 |
Plant type | Geothermal prototype with supercritical cycle |
Location | Livorno | Italy |
Customer | Enel Green Power |
Heat source | Hot water at 150°C nominal |
Cooling device | ‘dry & spray’ condenser |
Total electric power | 500 kWel |
In operation since | Q1 2012 |
Plant type | 1st EU EGS (Enhanced Geothermal System) plant |
Location | Soultz sous Forêts | Alsace | France |
Heat source | Hot water at 180°C |
Cooling source | Air |
Total electric power | 1.5 MW |
Net electric efficiency | 11.5% |
In operation since | Q2 2008 |
Plant type | Low enthalpy geothermal district heating system |
Location | Marktgemeinde | Altheim, Austria |
Heat source | Hot water at 106°C |
Cooling source | Cold water from a nearby river @ 10/18°C) |
Total electric power | 1 MW |
In operation since | Q1 2001 |
Plant type | Low enthalpy geothermal district heating system |
Location | Simbach | Braunau | German/Austrian border |
Cooling device | Air/water |
Total electric power | 200 kW |
In operation since | Q3 2009 |